SK System Scaffolding
SK System scaffolding is a temporary material that enables rapid and safety construction progress.

- System Scaffolding is a temporary material that enables rapid and safe construction progress. The system is attached to the standardized components using the firm wedge method. It results no shaking or separation. The working platform and safety railing are installed synchronously.
- The scaffolding is flexible to lock in multiple angles and can be aligned accurately to 45 – 90 by using a hammer. It allows up to 8 connections between segments and is self-locked by the wedge.
Wider working space
![]() |
Internal height
Vertical single section 190cm – Plank 5cm = 185cm
Worker
Average height(167cm) + Safety shoes(3cm) + Safety helmet(5cm) = 175cm Marginal height
= 10cm
|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |